BT supply problem holds up connections to LGfL

3rd January 2003 at 00:00
Problems in providing optical fibre links have caused unexpected delays in connecting schools to the London Grid for Learning (LGfL).

Chief executive Brian Durrant said that BT had not been able to lay cable fast enough to meet demand from the many schools wanting to join the network, as each one needed new cable laid.

As an interim solution, he said schools are being offered ADSL to provide access to the Grid until they can be connected by fibre.

A decision to use fibre links only was taken last year to ensure the network could cope with schools' future demand for bandwidth.

But despite starting a year later than the other regional grids, Mr Durrant said 20 per cent of London schools had a broadband connection by the end of August and he expected 40 per cent to have one by August this year.

Mr Durrant admitted there had been problems with the Canadian-based Netsweeper filtering system, which used artificial intelligence to assess web pages, but said they had now been resolved.

www.lgfl.net

Subscribe to get access to the content on this page.

If you are already a Tes/ Tes Scotland subscriber please log in with your username or email address to get full access to our back issues, CPD library and membership plus page.

Not a subscriber? Find out more about our subscription offers.
Subscribe now
Existing subscriber?
Enter subscription number

Comments

The guide by your side – ensuring you are always up to date with the latest in education.

Get Tes magazine online and delivered to your door. Stay up to date with the latest research, teacher innovation and insight, plus classroom tips and techniques with a Tes magazine subscription.
With a Tes magazine subscription you get exclusive access to our CPD library. Including our New Teachers’ special for NQTS, Ed Tech, How to Get a Job, Trip Planner, Ed Biz Special and all Tes back issues.

Subscribe now