A level maths references for UCAS (Updated for strong, middle and  weak students)Quick View
Gandhi_the_grey

A level maths references for UCAS (Updated for strong, middle and weak students)

(4)
Lots of A level maths references for different types of students, strong middling and weak. This could save you a lot of time.! (2025) I have acted on the reviews and rewritten all of the references. Pronouns are now ‘they’ to save editing time and all you have to do is change NAME to your students name 17 references for Strong students 20 references for middling students 19 references for weak students
All Lessons for Edexcel A Level Statistics (AS level content)Quick View
Gandhi_the_grey

All Lessons for Edexcel A Level Statistics (AS level content)

13 Resources
Lesson powerpoints and worksheets on Measures of average and spread PMCC and SRCC Linear regression Normal distribution Binomial distribution Chi squared hypothesis testing Non parametric hypothesis tests Sampling and Bias Graphs Normal approximation to the Binomial Probability Uniform distribution Discrete random variables
A-level  Pointless quizQuick View
Gandhi_the_grey

A-level Pointless quiz

(2)
Adapted resource. Caters for AQA core 2 with past papers questions. Excellent revision activity, groupwork and self differentiated, I have edited the scoring systems so there are a range of different scores available.
Edexcel A level statistics. 1. Measures of average and spread with the Casio FX-CG50 calculatorQuick View
Gandhi_the_grey

Edexcel A level statistics. 1. Measures of average and spread with the Casio FX-CG50 calculator

(1)
Powerpoints and worksheets on 8 lessons on measures of spread and average, aimed at Edexcel A level statistic students. Finding numerical measures from summary statistics Finding numerical measures from a list and frequency table Grouped frequency table with linear interpolation Linear interpolation and quartiles Standard deviation and variance Changes to mean and standard deviation Types of Data Discrete Interpolation (end points not matched up) Broken down as starter,examples,in class questions and plenary
Full Calculus (differentiation) for A level lesson notes + full solutions + match up startersQuick View
Gandhi_the_grey

Full Calculus (differentiation) for A level lesson notes + full solutions + match up starters

(0)
Covers the following Differentiation by first principles Equations of tangents and normals Stationary points Max and Min with second derivative Points of Inflection Optimisation A3 scaffolded revision sheet Chain, Product, Quotient and Implicit differentiation Full solutions to all included Powerpoints starter activities. Chain rule matching Includes Homework questions and answers
Edexcel A level Statistics: Confidence intervals with normal and T distribution with Casio FX-CG50Quick View
Gandhi_the_grey

Edexcel A level Statistics: Confidence intervals with normal and T distribution with Casio FX-CG50

(0)
Powerpoints and worksheet on Confidence intervals with normal and t distributions for Edexcel A level statistics. 7 Lessons on: Confidence intervals with large samples Confidence intervals with small sample but known population standard deviation Confidence intervals with formula for normal distribution Confidence intervals with t distribution Confidence intervals with summary stats Z or t quiz Mix Confidence intervals