Autumn Pumpkins – 20 Grid Drawing Worksheets | Seasonal Art Activities | KS3 & KS4Quick View
Shamer6

Autumn Pumpkins – 20 Grid Drawing Worksheets | Seasonal Art Activities | KS3 & KS4

(0)
A beautiful collection of 20 Autumn Pumpkin Grid Drawing Worksheets, designed to develop students’ observational drawing, proportion, accuracy and tonal skills through engaging seasonal imagery. Each worksheet features an autumn-themed photographic reference image with a 6 × 6 grid, alongside a larger blank 6 × 6 grid for students to recreate the image one square at a time. The collection progresses from straightforward individual pumpkins to more detailed compositions including autumn leaves, acorns, pinecones, baskets, harvest displays, lanterns and rustic still lifes. The variety of compositions makes the pack suitable for different confidence levels, allowing students to practise shape, proportion, detail, texture and tone while building confidence with observational drawing. This 20-resource pack includes themes such as: Individual, paired and grouped pumpkins White and decorative pumpkins Pumpkins with autumn leaves Acorns and pinecones Pumpkin baskets and wooden crates Pumpkin patches and harvest scenes Sunflowers and wheat Autumn doorsteps Lantern compositions Rustic autumn still lifes Detailed harvest displays Perfect for KS3 and KS4 Art, autumn-themed lessons, seasonal drawing activities, cover lessons, independent work, homework, early finishers, intervention activities and drawing-skills practice. The consistent grid format makes the worksheets easy to use independently, while the increasingly detailed reference images provide plenty of opportunity for students to challenge themselves. Skills developed: Observational drawing • Proportion • Accuracy • Detail • Tone • Texture • Composition • Pencil control • Confidence Includes 20 printable grid drawing activities.
Tall Pumpkin Grid Drawing Worksheet | Autumn Art | KS3 KS4Quick View
Shamer6

Tall Pumpkin Grid Drawing Worksheet | Autumn Art | KS3 KS4

(0)
A seasonal Tall Pumpkin 6 × 6 Grid Drawing Worksheet designed to build confidence in observational drawing. Students carefully reproduce the tall pumpkin from the photographic reference, using the grid to improve accuracy, proportion and placement. Ideal for developing pencil control, tonal shading and close observation. Suitable for KS3 and KS4 Art, autumn activities, cover lessons, homework and independent learning.
White Pumpkin Grid Drawing Worksheet | Autumn Art | KS3 KS4Quick View
Shamer6

White Pumpkin Grid Drawing Worksheet | Autumn Art | KS3 KS4

(0)
Challenge students to observe subtle changes in form, texture and tone with this White Pumpkin 6 × 6 Grid Drawing Worksheet. The gridded photographic reference encourages students to work methodically, transferring the image one square at a time onto the larger drawing grid. An excellent seasonal activity for developing proportion, accuracy, shading and observational skills at KS3 and KS4.
Classic Autumn Pumpkin Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Classic Autumn Pumpkin Grid Drawing Worksheet | KS3 KS4 Art

(0)
Develop students’ observational drawing skills with this Classic Autumn Pumpkin 6 × 6 Grid Drawing Worksheet. Students use the gridded photographic reference to recreate the pumpkin one square at a time, focusing on shape, proportion, detail, texture and tone. A straightforward seasonal subject ideal for introducing or reinforcing the grid drawing technique. Perfect for KS3 and KS4 Art, autumn lessons, cover work, homework, early finishers and independent drawing practice.
Mini Pumpkin Trio Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Mini Pumpkin Trio Grid Drawing Worksheet | KS3 KS4 Art

(0)
This Mini Pumpkin Trio 6 × 6 Grid Drawing Worksheet introduces students to a more complex composition featuring three contrasting pumpkins. Students use the photographic reference and grid to explore scale, overlapping forms, proportion, pattern and tonal variation. Perfect for KS3/KS4 Art, autumn projects, drawing practice, cover work, homework or early-finisher activities.
Pumpkin Pair Grid Drawing Worksheet | Autumn Drawing | KS3 KS4Quick View
Shamer6

Pumpkin Pair Grid Drawing Worksheet | Autumn Drawing | KS3 KS4

(0)
This Pumpkin Pair 6 × 6 Grid Drawing Worksheet asks students to recreate two contrasting pumpkins using a photographic gridded reference. The activity provides excellent practice in relative scale, proportion, shape, surface pattern and tonal shading, while the grid helps students break a more complex image into manageable sections. Suitable for KS3/KS4 Art, autumn lessons, cover and independent work.
Pumpkin and Pinecones Grid Drawing Worksheet | KS3 KS4 Autumn ArtQuick View
Shamer6

Pumpkin and Pinecones Grid Drawing Worksheet | KS3 KS4 Autumn Art

(0)
A detailed seasonal drawing task featuring a pumpkin surrounded by pinecones and autumn leaves. Students use the 6 × 6 grid to accurately transfer the composition while concentrating on texture, proportion, intricate detail and tonal variation. Great for stretching students beyond simple forms and developing patient, careful observation. Ideal for KS3 and KS4 Art lessons, homework, cover work and seasonal drawing activities.
Pumpkin Basket Grid Drawing Worksheet | Autumn Art Activity KS3 KS4Quick View
Shamer6

Pumpkin Basket Grid Drawing Worksheet | Autumn Art Activity KS3 KS4

(0)
This Pumpkin Basket 6 × 6 Grid Drawing Worksheet features an autumn arrangement of pumpkins inside a woven basket. Students can develop their understanding of proportion, overlapping forms, texture, pattern and tone, with the woven basket providing an additional observational challenge. Perfect for KS3/KS4 Art, autumn projects, cover lessons, homework and independent drawing practice.
Pumpkin with Autumn Leaves Grid Drawing Worksheet | KS3 KS4Quick View
Shamer6

Pumpkin with Autumn Leaves Grid Drawing Worksheet | KS3 KS4

(0)
A detailed autumn drawing activity featuring a pumpkin surrounded by seasonal leaves. Students recreate the reference image using the 6 × 6 grid, developing their understanding of proportion, organic shapes, texture, detail and tone. Ideal for autumn Art lessons, observational drawing practice, cover lessons, homework and independent KS3/KS4 work.
Pumpkin in a Wooden Crate Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Pumpkin in a Wooden Crate Grid Drawing Worksheet | KS3 KS4 Art

(0)
Explore contrasting natural textures with this Pumpkin in a Wooden Crate 6 × 6 Grid Drawing Worksheet. Students recreate the autumn photograph using the grid, paying particular attention to pumpkin form, wooden textures, perspective, proportion and tonal detail. A useful seasonal drawing resource for KS3 and KS4 Art, cover lessons, homework, early finishers and observational drawing practice.
Pumpkin Patch Grid Drawing Worksheet | Autumn Landscape Art KS3 KS4Quick View
Shamer6

Pumpkin Patch Grid Drawing Worksheet | Autumn Landscape Art KS3 KS4

(0)
Move beyond still life with this atmospheric Pumpkin Patch 6 × 6 Grid Drawing Worksheet. Students recreate a pumpkin patch scene from the gridded photographic reference, exploring foreground, background, scale, depth, composition and natural forms. An engaging autumn activity for developing both observational and landscape drawing skills with KS3 and KS4 students.
Pumpkins on Wooden Steps Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Pumpkins on Wooden Steps Grid Drawing Worksheet | KS3 KS4 Art

(0)
This more detailed Pumpkins on Wooden Steps 6 × 6 Grid Drawing Worksheet features multiple pumpkins arranged across a rustic autumn doorstep. Students practise composition, relative scale, perspective, overlapping forms, texture and tonal shading while using the grid to accurately reproduce the scene. An excellent progression activity for confident KS3 and KS4 Art students.
Pumpkin and Sunflowers Grid Drawing Worksheet | Autumn Art KS3 KS4Quick View
Shamer6

Pumpkin and Sunflowers Grid Drawing Worksheet | Autumn Art KS3 KS4

(0)
Combine seasonal still life and botanical drawing with this Pumpkin and Sunflowers 6 × 6 Grid Drawing Worksheet. Students reproduce the photographic composition while developing proportion, observation, organic shape, overlapping forms, detail and tone. The contrasting structures of the pumpkin and sunflowers provide an engaging drawing challenge for KS3 and KS4 Art students.
Pumpkin and Wheat Grid Drawing Worksheet | Harvest Art | KS3 KS4Quick View
Shamer6

Pumpkin and Wheat Grid Drawing Worksheet | Harvest Art | KS3 KS4

(0)
A harvest-themed Pumpkin and Wheat 6 × 6 Grid Drawing Worksheet designed to strengthen observational drawing and accuracy. Students recreate the pumpkin and surrounding wheat from the photographic reference, focusing on form, proportion, fine line detail, texture and tonal variation. Ideal for autumn or harvest Art lessons, cover work, homework and independent KS3/KS4 drawing practice.
Ultimate Autumn Pumpkin Still Life Grid Drawing Worksheet | KS3 KS4Quick View
Shamer6

Ultimate Autumn Pumpkin Still Life Grid Drawing Worksheet | KS3 KS4

(0)
The most detailed activity in the collection, this Ultimate Autumn Pumpkin Still Life 6 × 6 Grid Drawing Worksheet provides students with a rich and challenging seasonal composition. Featuring multiple pumpkins alongside autumn foliage, pinecones, rustic objects and a glowing lantern, students must carefully observe scale, proportion, overlapping forms, texture, detail, light and tone as they recreate the image square by square. Perfect as a final challenge, extended drawing activity, assessment-style task, cover lesson or independent KS3/KS4 Art resource.
Pumpkin and Autumn Lantern Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Pumpkin and Autumn Lantern Grid Drawing Worksheet | KS3 KS4 Art

(0)
An atmospheric autumn drawing activity combining pumpkins, foliage and a glowing lantern. Students use the 6 × 6 grid to recreate the photographic reference while exploring shape, proportion, texture, light, shadow and tonal contrast. Particularly useful for encouraging students to consider how light affects objects within a still-life composition. Suitable for KS3 and KS4 Art.
Autumn Pumpkin Doorstep Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Autumn Pumpkin Doorstep Grid Drawing Worksheet | KS3 KS4 Art

(0)
This Autumn Pumpkin Doorstep 6 × 6 Grid Drawing Worksheet features a detailed seasonal arrangement of pumpkins, flowers, foliage and a lantern. Students can develop composition, proportion, perspective, texture and tonal drawing skills while working systematically through the gridded reference. An engaging autumn resource for KS3/KS4 Art lessons, independent work, homework or cover.
Autumn Pumpkin Harvest Display Grid Drawing Worksheet | KS3 KS4Quick View
Shamer6

Autumn Pumpkin Harvest Display Grid Drawing Worksheet | KS3 KS4

(0)
A challenging seasonal grid drawing featuring a detailed Autumn Pumpkin Harvest Display. Students recreate a layered composition containing pumpkins, flowers, crates, baskets, foliage and a lantern, developing their ability to observe proportion, depth, texture, overlapping forms and fine detail. Ideal as a higher-challenge activity for KS3 and KS4 Art students.
Pumpkin Harvest Wheelbarrow Grid Drawing Worksheet | KS3 KS4Quick View
Shamer6

Pumpkin Harvest Wheelbarrow Grid Drawing Worksheet | KS3 KS4

(0)
Challenge students with a detailed Pumpkin Harvest Wheelbarrow 6 × 6 Grid Drawing Worksheet featuring pumpkins, autumn foliage and a rustic wooden wheelbarrow. The complex composition encourages careful observation of proportion, perspective, overlapping objects, texture, detail and tone. Perfect as a more challenging KS3/KS4 seasonal drawing task, cover lesson or independent activity.
Rustic Pumpkin Still Life Grid Drawing Worksheet | KS3 KS4 ArtQuick View
Shamer6

Rustic Pumpkin Still Life Grid Drawing Worksheet | KS3 KS4 Art

(0)
Develop still-life drawing skills with this detailed Rustic Pumpkin Still Life 6 × 6 Grid Drawing Worksheet. Featuring pumpkins, apples, pinecones, autumn foliage and rustic objects, the composition gives students opportunities to explore overlapping forms, scale, texture, composition and tonal contrast. A strong choice for more developed KS3 and KS4 observational drawing practice.
Pumpkin and Acorns Grid Drawing Worksheet | Autumn Art KS3 KS4Quick View
Shamer6

Pumpkin and Acorns Grid Drawing Worksheet | Autumn Art KS3 KS4

(0)
Develop observational skills with this Pumpkin and Acorns 6 × 6 Grid Drawing Worksheet. The autumn composition combines a pumpkin, fallen leaves and acorns, giving students opportunities to explore contrasting shapes, scale, natural textures and tonal detail. A ready-to-use activity for KS3 and KS4 Art, seasonal lessons, cover work, homework and drawing-skills practice.